SQERT Project Management PowerPoint Template

Pentagon Shape SQERT Template
Project Analysis Diagram of SQERT
SQERT Model PowerPoint Quality Management
Pentagon Shape of PowerPoint for SQERT
Project Management PowerPoint Slide of SQERT
Project Time Management Analysis SQERT

The SQERT Project Management PowerPoint Template is a useful model presentation for Project Management field experts. The acronym SQERT stands for Scope, Quality, Effort, Risk and Timing. Unlike the classic constraints triangle i.e. Scope, Time and Cost which impact on quality. The SQERT works well in the periodic trend analysis reports specific to projects. Often, to explain SQERT model, the simple geometric pentagon shapes helps demonstrate each component easily. Therefore, this PowerPoint is accessible to managers, teachers and students of the field. The 5-stage model diagram assists in understanding following basic project constraints:

  • Scope – List of goals, objectives and activities to complete a project
  • Quality – Meeting stakeholder’s requirement
  • Effort – Work of resources to deliver project goals
  • Risk – Outcome of variances effecting level of tolerance
  • Time – Required duration to deliver end results.

The slides of SQERT Project Management PowerPoint Template is a pentagon shape of five quadrilaterals. The PowerPoint contain infographic icons representing all five constraints of the diagram. These icons include, hour glass, bomb, hammer, briefcase and 5-star. Further, the five slides of template highlight one factor of model in sequence. For this purpose, one factor is colored with the similar pentagon shape of text placeholder. This option assists in adding textual content to describe the topic of slide. Although the PowerPoint diagram of SQERT is editable and help customize basic features like color, size of placement of object. However, the presentation template also enables users to change background, color theme. Moreover, select desire icons and object of PowerPoint to reuse in other presentations.

The project management PowerPoint model of SQERT is an outstanding design for project managers during planning presentations. Add details in the text placeholders or the training material for program team and students. With visual graphics, it helps focus on multiple factors at once and show effective management.

You must be logged in to download this file.

DOWNLOAD

Details (6 slides)

Category
Rating
3 votes, average: 5.00 out of 53 votes, average: 5.00 out of 53 votes, average: 5.00 out of 53 votes, average: 5.00 out of 53 votes, average: 5.00 out of 5
Loading...
Size
16x94x3
Item ID
7492-01
Colors

Supported Versions:

PowerPoint 2007PowerPoint 2010PowerPoint 2013PowerPoint 2011 MacKeynotePowerPoint 2016PowerPoint 2016 MacOffice 365Google Slides
How to get this PowerPoint Template?

Subscribe today and get immediate
access to download our PowerPoint templates.

Subscribe Now