Simple Animated PowerPoint Template

  • Creative Animated Timeline for PowerPoint
  • PowerPoint Slide Design Dark Background
  • Dark Agenda Slide Design for PowerPoint with Table of Content
  • 4 Points and Display Clipart for PowerPoint
  • Four Badge Clipart for PowerPoint with Numbers
  • 4 Steps Layout with PowerPoint Icons

Simple Animated PowerPoint Template is a professional PowerPoint design that you can use as a PPT template to make stunning project presentations using Microsoft PowerPoint.

This animated PowerPoint template contains 6 unique slide designs & layouts that can help you to prepare catchy and modern presentations using a dark background design and animated PowerPoint objects.

Here is a live preview of a PowerPoint presentation using this animated PPT template design.

Alternatively to this presentation template you can download other cool PowerPoint backgrounds and template designs.

You must be logged in to download this file.

Details (6 slides)

Rating:
6 votes, average: 4.67 out of 56 votes, average: 4.67 out of 56 votes, average: 4.67 out of 56 votes, average: 4.67 out of 56 votes, average: 4.67 out of 5
Loading...
Size: 16x9 
Item ID: 4005-01
Colors:

Supported Versions:

PowerPoint 2007PowerPoint 2010PowerPoint 2013PowerPoint 2011 MacPowerPoint 2016PowerPoint 2016 MacOffice 365Google Slides

Categories:

Tags: