Flat Design Content Marketing Matrix for PowerPoint

PowerPoint Design of Content Marketing Matrix

Featured on the slide design is a Flat Design Content Marketing Matrix for PowerPoint. It is ideal for showing the different levels of strategies which must be implemented for specific circumstances. It can be used to demonstrate the current state of marketing to management. This would allow them to better make their decisions to fit the company’s benchmarks.

A grid, or graph, can be found on the PowerPoint slide. It has been divided into four quadrants by two intersecting lines. The quadrants are labeled entertain, inspire, educate, and convince. These refer to the specific actions to be taken for certain levels of buying behavior. The PowerPoint objects are 100% editable, and may be customized to suit the presenter’s needs and preferences.

Return to Content Marketing Matrix PowerPoint Template.

Activate your subscription

Download unlimited PowerPoint templates, charts and graphics for your presentations with our annual plan.

Slide Tags:
Assets, Awarness, Brainstorming, Canvas, Content, Convince, Educate, Emotional, Entertein, Inspire, Marketing, Matrix, Media, Purchase, Rational
Template Tags:
, , , , , , , , , ,

Return to Content Marketing Matrix PowerPoint Template

Download Unlimited Content

Our annual unlimited plan let you download unlimited content from SlideModel. Save hours of manual work and use awesome slide designs in your next presentation.


Subscribe Now