Home Generic Progress Report Presentation Template Slide for Issues Faced Presentation
The image displays the fifth slide of a “Generic Progress Report” PowerPoint template, focusing on the “Issues Faced” during a project. The slide is divided into two sections, with text on the right and visual elements on the left.
The right section features a bold heading “Issues Faced” at the top, followed by a subheading “Describe the main issues faced during the project. Add any other relevant info.” This prompts the presenter to discuss challenges encountered during the project’s timeline. Below are three bullet points, each with a circular icon — a replay icon, a user icon, and a settings gear icon. Accompanying each icon is a placeholder text line, “This is a sample text. Insert your desired text here,” indicating where the presenter can elaborate on specific issues.
On the left side of the slide, a grayscale image shows a group of miniature figurines portraying business professionals. One figure stands apart and in focus in the foreground, while a group of figures is seen conversing in the background, slightly out of focus. This visual metaphor may suggest a scenario where one individual is addressing a group or is separated from the group due to differing views or isolation caused by problems faced.
In the lower-left corner, there is an additional placeholder for text or data, indicated by a smaller text box and an icon that resembles a video camera or projector.
The slide’s background is a light gray, providing a neutral canvas that highlights the content. A navy blue block anchors the bottom of the slide, with decorative plus signs scattered across it, and the slide number “5” prominently displayed.
This template could be used in business or project meetings to address and discuss obstacles, with the aim to inform team members, stakeholders, or clients about the challenges encountered and the measures taken to overcome them. The design is professional and focuses on encouraging detailed discussion of project difficulties.
The description of this slide was generated using AI (ChatGPT v4.0)
Download unlimited PowerPoint templates, charts and graphics for your presentations with our annual plan.
DOWNLOAD